
Written in concrete, from Marianopoli, Sicily to the runways of the western United States.

In 1950, Michael, fifteen, and Emmanuel Baldi, thirteen, left their hometown of Marianopoli, Sicily with courage in their hearts and little more than a dream.
They arrived in America seeking opportunity, soon joined by their oldest brother Pasquale Baldi, twenty, in 1953. Together, they planted the first seeds of what would grow into a proud, family run construction legacy that still stands strong today.
The foundation of Baldi Bros was built on determination, faith, and a relentless work ethic. From humble beginnings to California builders, the Baldi brothers turned every challenge into opportunity.

Emmanuel, thirteen, and Michael, fifteen, arrive in America from Sicily, later joined by their brother Pasquale, twenty, in 1953.
In Jamestown, New York, they started their first construction business, hand digging and pouring concrete basements.
The brothers moved west to California, drawn by sunshine and opportunity. They began building houses in Cherry Valley and Beaumont, forming the roots of Baldi Bros Construction.
The brothers earned their California contractor’s license, marking the official start of Baldi Brothers Construction.
Baldi Bros completed the Catholic Church Hall, one of their early landmark projects in the community.
Purchased our first new piece of equipment, a CAT 950 Loader, a symbol of progress and a flagship that remains part of our story today.
Expanded our work across Southern California, building barracks, schools, and resort projects.
Baldi Bros completed three large concrete tilt up buildings in Beaumont, CA, now home to our headquarters.
Baldi Bros completed the prestigious Desert Princess resort in Cathedral City, CA.
As the next generation stepped in, a group of five brothers and cousins, they brought fresh energy and a new sense of drive. American born and raised around job sites, they loved off road adventures, heavy equipment, and turning wrenches. Skilled fabricators and natural mechanics, they thrived on building, fixing, and creating in house. Their passion for machinery and innovation helped shape the future of Baldi Bros, leading the company into larger, more technical projects while holding true to the family’s work ethic and pride.

The second generation takes a leading role, ushering in a new era of growth while maintaining the family’s core values of integrity and craftsmanship.
Completed first concrete stormwater slope lining project in Palm Springs, CA, expanding operations into challenging terrain.
Awarded Anti-Armor Range Complex project at 29 Palms Marine Corp Base, one of the company’s largest at the time: 1,200 acres and 250,000 cubic yards.
Purchased our first mobile concrete batch plant and produced concrete for Barstow Naval Logistics Base Environmental Cap, marking a shift toward self performing major concrete operations.
Added the first nine axle lowboy, slipform paver, and haul truck, enabling larger scale transportation and paving work.
Built the M1 Abrams tank test track and landfill cap at Barstow Naval Logistics Base, continuing to expand DoD and infrastructure experience.
Purchased a mobile asphalt plant and began producing asphalt for major projects, including Channel Islands Air National Guard.
Acquired a mobile crushing plant operation, reinforcing Baldi Bros’ in house material capabilities.
Completed the first stringless paving at SCLA, a major leap in precision technology.
Purchased the second mobile concrete batch plant.
Added the CAT 5110 large excavator, representing the company’s growing capacity for large scale demolition and civil work.
Completed the first runway project at Travis Air Force Base (03R/21L and SLZ), a key milestone in DoD airfield construction.
First OCONUS project at Hickam Air Force Base in Hawaii for a major F22 Raptor parking apron project.
Baldi Bros. was awarded both the China Lake Runway 03/21 and Runway 08/26 projects, which involved the simultaneous reconstruction of two runways under comprehensive design-build contracts.
Members of the second generation remain heavily involved today, mentoring the next generation and continuing to lead with the same grit, creativity, and pride that has defined Baldi Bros for over 70 years.
The third generation began working in the company during the 2010s, learning the business from the ground up: in the field, on the paving crew, and beside their fathers and uncles. By the 2020s, they began combining the company’s hard earned experience with fresh ideas and modern technology.

The third generation contributes to major projects, continuing to expand operations across the Western US.
Constructed a series of high strength concrete test structures in a remote location, among the largest of their kind in the world. In support of the Department of War
Awarded our second Travis AFB Runway demolition & reconstruction project 03L/21R.
Paved over 150,000 cubic yards at NAWS China Lake for the South Airfield and Runway 08/26 widening & extension project.
Achieved the company’s largest paving day ever, running two concrete batch plants simultaneously and paving 37.5 feet wide and 17 inches thick, a grand total of 5,502 cubic yards placed. A milestone in efficiency and precision.
Added the CAT 990 loader to the fleet, symbolizing continued growth and investment in the future.
Today, the third generation leads with enthusiasm and vision, working side by side with the second generation to carry forward the family legacy. And already, Generation 4 is showing their fascination with the work, the equipment, and the same sense of pride that began in 1950.
From hand dug basements in New York to complex military projects and civil works across California, our story is one of family, craftsmanship, and perseverance.
We have weathered decades of change, yet our foundation has never shifted. Beaumont, California remains our home, and the Baldi Bros legacy continues to grow stronger with each generation.
From the estimating table to the field, the Baldi family is hands on every day.