Full-depth reconstruction and replacement of V-22 airfield pavements at NAS North Island. Workincluded PCCP demolition and replacement, earthwork, cement-treated base, storm drain andindustrial waste utilities, medium-voltage electrical distribution, wash rack, substation, and airfieldlighting. Existing concrete was recycled onsite for reuse in CTB production.