Reconstruction Runway 9/27 & taxiways at Naval Base Ventura Point Mugu

Contract Value
$18,965,836.54

Scope of Work

Full-depth reconstruction and replacement of V-22 airfield pavements at NAS North Island. Workincluded PCCP demolition and replacement, earthwork, cement-treated base, storm drain andindustrial waste utilities, medium-voltage electrical distribution, wash rack, substation, and airfieldlighting. Existing concrete was recycled onsite for reuse in CTB production.

Project highlights

  • Contract Value: $34.72M
  • 36,000+ CY PCCP
  • 45,000 tons recycled concrete used in CTB
  • 614,000 SF apron reconstruction
  • 278,000 SF Taxiway L reconstruction
  • PCCP up to 13" thick
  • Major storm drain and utility improvements