
Remove and replace existing runway 03/21L and associated taxiways. Replace at new width of 150 foot wide with 25-foot-wide paved shoulders and overruns. Remove and replace storm drain system and structures. Remove and replace runway edge lighting system with mainline ducting to vault room and install new drainage system across site.





Our estimating team can scope, price, and mobilize anywhere in the western United States.