This project involved the placement of over 36,000 CY of concrete in compliance with:
- 32 13 14.13– Concrete Paving for Airfields & Other Heavy Duty Pavements
- 32 13 13.43– High Temperature Concrete Paving for Airfields Using Traprock Aggregates
Airfield Pavement
Full-depth repair and replacement, including removal of existing PCCP paving and installation of new pavementsections.
Earthwork & Base
Excavation and grading, placement of Cement Treated Base.
Utilities & Infrastructure
- Storm Drain Utilities
- Industrial Waste Utilities
- Medium Voltage Distribution
- Substation and Wash Rack systems
- Airfield Lighting for apron, taxiway, and helipad operations
Sustainability & Recycling
Successfully recycled the existing concrete, repurposing it into 45,000 tons of cement-treated basefor use on the project.