P-1018 CMV-22B Airfield Improvements V-22 Apron, Taxiway, and Helipad

Contract Value
$34,717429.75

Scope of Work

This project involved the placement of over 36,000 CY of concrete in compliance with:

  • 32 13 14.13– Concrete Paving for Airfields & Other Heavy Duty Pavements
  • 32 13 13.43– High Temperature Concrete Paving for Airfields Using Traprock Aggregates
‍

Airfield Pavement

Full-depth repair and replacement, including removal of existing PCCP paving and installation of new pavementsections.

‍

Earthwork & Base

Excavation and grading, placement of Cement Treated Base.

‍

Utilities & Infrastructure

  • Storm Drain Utilities
  • Industrial Waste Utilities
  • Medium Voltage Distribution
  • Substation and Wash Rack systems
  • Airfield Lighting for apron, taxiway, and helipad operations

‍

Sustainability & Recycling

Successfully recycled the existing concrete, repurposing it into 45,000 tons of cement-treated basefor use on the project.